Object Type: Folder
In Folder: Series 14: Transportation
A report by Robert Moses that identifies the ways in which Pittsburgh could improve their thoroughfare system through a ten-year project program. Maps, drawings, and renderings of proposed systems and ideas are also included.
1939
A report on the proposed use of the Boulevard of the Allies as a limited access highway to connect the Penn-Lincoln Parkway-East (today I-376) with the Crosstown Blvd.
1962
An analysis from the Allegheny County Planning Commission regarding Robert Moses' ten-year program proposed in his report titled "Arterial Plan for Pittsburgh."
1939